Skip to content

Container Loading Inspection — Standard Operating Procedure & Record

1. Purpose & Scope

This procedure ensures that every export container loaded with paprika products meets the required hygiene, safety, and documentation standards before departure. Pre-loading container inspection, in-process loading supervision, and post-loading documentation verification protect product quality during transit and provide evidence for claims if damage occurs.

Scope: All export shipments of paprika products (powder, flakes, whole pods) in shipping containers (20 ft and 40 ft FCL). Applies to loading at Dinweys warehouses and at supplier facilities where Dinweys arranges loading supervision.


2. Equipment & Consumables

Item Specification Purpose
Flashlight LED, 300+ lumens Inspect container corners, floor, ceiling
IR Thermometer ±0.5°C Measure container interior temperature
Hygrometer ±3% RH Measure humidity inside container
Camera Smartphone or digital (12 MP min) Document pre-load and loading condition
Inspection mirror 360° articulating, telescopic handle View behind stacked pallets
Tape measure 5 m length Confirm container interior dimensions
PPE Gloves, safety shoes, dust mask Protection during inspection
Loading plan (printed) Per container specification Guide pallet placement
Seal High-security bolt seal ISO 17712 standards
Desiccant bags Silica gel, 500 g unit bags Place per loading plan
Container liner (if used) Food-grade PE, full-length roll Install before loading
Label / marking pen Waterproof, UV-resistant Label pallet positions

3. Detailed Procedure — Step by Step

Phase 1: Pre-Loading Container Inspection

Perform BEFORE any product enters the container.

Step Action Critical Points
1.1 Verify container number matches booking confirmation Cross-check against shipping documents
1.2 External inspection — check for dents, holes, rust, structural damage Any hole >25 mm = reject container
1.3 Door inspection — hinges, locking rods, door seals Must open/close smoothly; seals intact
1.4 Interior floor inspection Clean, dry, no nails, splinters, or stains (chemical, oil, mold)
1.5 Interior walls & ceiling No holes, rust patches, flaking paint, moisture streaks
1.6 Odor check Seal container for 5 min, open, and smell. Any chemical/diesel/mold/putrid odor = REJECT container
1.7 Moisture check Run hand over floor and lower 30 cm of walls — must be bone dry
1.8 Reefer container check (if applicable) Set point confirmed (18–22°C), pre-cooled to temp, vents set per product requirements, data logger present
1.9 Ventilation check (ambient container) Top/bottom vents open per climate (50% open for moderate climates, closed for high humidity)
1.10 Grooves/floor channels Clear of debris; allow air circulation under pallets

Pass/Fail: If ANY item fails, REJECT the container and request a replacement. Do NOT load.

Phase 2: Container Preparation

Step Action Details
2.1 Install container liner (if specified) Unfold full-length PE liner along floor, draping equally up sides
2.2 Place dunnage or corner protectors Cardboard or plastic corner protectors at pallet contact points
2.3 Pre-position desiccant 6–12 sachets per 20 ft container, placed on floor along centerline, avoiding contact with pallet bottom (risk of moisture wicking)

Phase 3: Loading Supervision

Step Action Details
3.1 Verify pallet condition: intact, dry, no protruding nails Reject damaged pallets; replace before loading
3.2 Check stretch wrap: secure, full coverage, no loose tails Re-wrap if incomplete
3.3 Confirm pallet label matches container booking (product, grade, batch, net weight) Mismatch = reject pallet
3.4 Load pallets per loading plan Usually: wider load at front → narrower toward door; interlocking pattern for stability
3.5 Verify air gap at rear doors Leave 8–10 cm gap between last pallet row and doors for air circulation and to prevent door damage
3.6 Gap filling between pallets where gaps exceed 15 cm Use inflatable dunnage bags or cardboard filler to prevent pallet shift during transit
3.7 For reefer: ensure air channel at rear doors is clear DO NOT block T-bar floor channels or rear door airflow
3.8 Record loading pattern (draw or photograph) Top-view diagram of pallet positions

Phase 4: Post-Loading Closure

Step Action Details
4.1 If liner used: fold liner top closed Fold and tape closed (not sealed — allow minimal air exchange)
4.2 Install door corner guards Protect liner from door latch damage
4.3 Close and lock right door first, then left Standard container door closing order
4.4 Apply seal Thread through door locking mechanism; record seal number; verify seal is ISO 17712 high-security
4.5 Photograph seal Close-up showing seal number clearly
4.6 Record container number and seal number on all documents

4. Container Loading Inspection Record

4.1 General Information

Field Value
Inspection Date
Inspector Name
Loading Location
Container Number
Seal Number
Container Type [Ambient / Reefer — ___°C set point]
Product Name(s)
Batch Number(s)
Total Pallets Loaded
Total Packages
Net Weight (kg)
Gross Weight (kg)

4.2 Pre-Loading Container Inspection

Check Pass Fail Notes
Container clean and dry (floor, walls, ceiling)
No odors (chemical, mold, diesel, musty)
Floor condition (no nails, splinters, damage)
Walls and ceiling (no holes, rust)
Door seals (intact, functional)
Ventilation settings correct
Reefer: pre-cooled to set point
Container liner installed (if used)

4.3 Loading Supervision

Check Pass Fail N/A Notes
Pallet condition (intact, dry)
Stretch wrap applied properly
Loading pattern documented
Gap filling used to prevent shifting
Desiccant placed (quantity: ___ , location: ___)
Container liner used (food-grade)
Load weight verified (≤ max payload)
Load diagram / photo taken

5. Acceptance Criteria & Decision Rules

Condition Decision
All pre-loading checks pass, loading pattern correct, seal applied APPROVED FOR SHIPPING
Minor issues (e.g., 1–2 pallets re-wrapped during loading) APPROVED with notes — no further action
Container rejected (odor, damage, moisture) DO NOT LOAD — request replacement container; document with photos
Loading pattern unsafe (gaps >20 cm unfilled, pallets unstable) RE-LOAD — do not close container until pattern corrected
Pallet labels mismatch shipment documents HOLD — verify and correct before closing

6. Documentation Requirements

The following documents must be collected and filed with the shipment record:

Document Required Notes
Container loading inspection report Completed and signed
Loading photos (minimum 4: empty container, half-load, full load, seal close-up) Digital copies
Weight certificate From weighbridge
Packing list Per container
Container liner certificate (if used) Food-grade compliance
Desiccant specification & batch If desiccant used
Reefer data logger file (if reefer) Download and file

7. Troubleshooting

Scenario Corrective Action
Container floor has oil/chemical stain Reject container; request clean replacement
Desiccant insufficient for container volume Add 6 more sachets before closing
Pallet count does not match packing list Recount; do not seal until numbers match
Reefer not pre-cooled at loading time Wait for set point; do NOT load warm product into non-cooled reefer
Container seal number differs from booking Use actual seal number; update all documents
Loading completes after dark Ensure adequate lighting; take photos with flash; note on report

8. Calibration / Verification

Equipment Frequency Method
IR Thermometer Quarterly Ice bath / boiling water check
Tape measure Annually Against certified ruler
Weighbridge Annually Local metrology authority certification

9. References


This document is part of the official technical documentation library for paprikabulk.com operated by Dinweys (Qingdao).Co.,Ltd. All rights reserved. For the latest version, visit paprikabulk.com.